London Serpentine Pavilion 2017
[Serpentine Pavilion 2017, designed by Francis Kéré. Serpentine Gallery, London (23 June – 8 October 2017) © Kéré Architecture, Photography © 2017 Iwan Baan]
On 20 June 2017, the Serpentine Gallery in London’s Hyde Park revealed their 17th annual Pavilion. Designed by Burkinabe architect Diébédo Francis Kéré, the indigo-blue, oval-shaped structure is defined by curving walls, a slatted timber roof and a poured-concrete base.
Kéré has based his design on the concept of a tree as a place of shelter from the weather and as a place to gather.
[Serpentine Pavilion 2017, designed by Francis Kéré. Serpentine Gallery, London (23 June – 8 October 2017) © Kéré Architecture, Photography © 2017 Iwan Baan]
The walls of the pavilion are formed by batons of blue-stained timber arranged to create triangular panels. Natural light is allowed through the walls by a perforated pattern of gaps between each panel.
Designing the pavilion with the changeable British climate in mind, a ring-shaped slatted-timber roof is tiled to funnel rain down from an overhead oculus into a central courtyard, transforming it into a waterfall. The water can then be used for irrigating the park.
[Serpentine Pavilion 2017, designed by Francis Kéré. Serpentine Gallery, London (23 June – 8 October 2017) © Kéré Architecture, Photography © 2017 Iwan Baan]
Kere said:
“As an architect, it is an honour to work in such a grand park. Every path and tree, and even the Serpentine lake, were all carefully designed. I am fascinated by how this artificial landscape offered a new way for people in the city to experience nature. In Burkina Faso, I am accustomed to being confronted with climate and natural landscape as a harsh reality.
“For this reason, I was interested in how my contribution to this Royal Park could, not only enhance the visitor’s experience of nature, but also provoke a new way for people to connect with each other.”
Kéré's Serpentine Pavilion opens to the public from 23 June until 8 October 2017.
All images and content courtesy of London Serpentine Gallery.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
What they are, how they work and why they are popular in many countries.
Plastic, recycling and its symbol
Student competition winning, M.C.Esher inspired Möbius strip design symbolising continuity within a finite entity.
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.
Biomass harvested in cycles of less than ten years.
An interview with the new CIAT President
Usman Yaqub BSc (Hons) PCIAT MFPWS.
Cost benefit model report of building safety regime in Wales
Proposed policy option costs for design and construction stage of the new building safety regime in Wales.
Do you receive our free biweekly newsletter?
If not you can sign up to receive it in your mailbox here.



























